Mid-market companies often discover that a China-relatedproblem becomes urgent only after money, tooling, inventory, or customer commitments are already at risk. The practical steps below are intended to help management identify the right counterparty, preserve leverage, and decide when
local counsel or other specialists should become involved.
Map what must move
List tooling, fixtures, technical drawings, software,samples, raw materials, unfinished goods, packaging, certifications, and supplier contacts. Determine ownership and physical location.
Secure the new supplier before triggering conflict
Verify the replacement factory, conduct trial production,and assess whether it can use existing tooling. Some transitions fail because the new factory cannot reproduce the product without cooperation from the old supplier.
Manage contractual obligations
Review termination, minimum purchase, exclusivity, tooling,confidentiality, and payment provisions. Resolve disputed invoices where commercially sensible to avoid leverage over the transfer.
Control information flow
Provide the new factory only what it needs and use updatedconfidentiality, IP, and manufacturing agreements. A transition can increase leakage risk because multiple suppliers possess the same files.
Use local coordination
For valuable tooling or contentious relationships, arrangesupervised inventory and transfer. A local lawyer, quality-control firm, or logistics provider can document condition and possession.
Practical next step
Before sending additional money or escalating the dispute, assemble the Chinese business license, contract, purchase orders, invoices, bank details, payment records, and key communications. A focused review can identify the correct entity, the immediate leverage points, and whether a legal demand, local
verification, negotiation, or litigation assessment is justified.